TM 5-3805-292-23
0169
NITROGEN DISCHARGING/CHARGING CONTINUED
Charging Hammer - Continued
000169
8. Install cap (Figure 15, Item 1) on fitting (Figure 15, Item 2).
Figure 15. Gas Valve Assembly.
0169
9. Install two hoses (Figure 16, Item 1) on fittings (Figure 16, Item 2).
Figure 16. Hoses.
0169
END OF TASK
FOLLOW-ON TASK
000169
Verify correct operation of hammer (TM 5-3805-292-10).
END OF TASK
END OF WORK PACKAGE
0169-12