• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 8. Directional and Downshift Switches Wiring Harness.
Figure 10. Install Control Handle Connections.

Field Maintenance Manual For 924H Wheel Loader -4 Page Navigation
  168    169    170    171    172  173  174    175    176    177    178  
img
.
TM 5-3805-298-23-4
0379
INSTALLATION CONTINUED
NOTE
Install hoses as noted during removal.
5. Connect eight hoses (Figure 9, Item 3) on pilot valve assembly (Figure 9, Item 2) and tighten eight tube nuts
(Figure 9, Item 1).
Figure 9. Pilot Valve Connections.
0379
0379-9


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.