• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 4. Implement Control - Continued.
Table 4. Implement Control - Continued.

Field Maintenance Manual 1 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  756    757    758    759    760  761  762    763    764    765    766  
img
.
TM 5-3805-291-23-1
TROUBLESHOOTING WITH A DIAGNOSTIC CODE - CONTINUED
0009 00
Table 4. Implement Control - Continued.
(MID 082)
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
(b) Remove jumper wire from contact
0492 05 - Continued.
1 to 2.
(c) Reconnect solenoid valve to wiring
harness.
(d) Disconnect wiring harness from
implement ECM (WP 0060 00).
(e) At wiring harness connector for
1. If resistance is greater than 5,000 Ohms
implement ECM, measure
(no continuity), harness has failed.
resistance between contacts J1-60
Replace wiring harness in question (WP
(wire J813-BK) and contact J1-58
0195 00 thru WP 0201 00).
(wire E919-YL).
2. If resistance is from 6 to 12 Ohms,
harness circuit resistance is correct. Exit
this procedure and perform this
troubleshooting procedure. Also,
recheck if diagnostic code indicator is
active for this diagnostic code. If cause is
not found, replace implement ECM (WP
0060 00).
N OT E
Approximate resistance of proportional solenoid valve is from 6 to 12
Ohms.
427-C1667
N OT E
0492 06
All solenoid return lines connect to contact J1-60 (wire J813-BK) of implement
ECM.
The following test procedure may create other diagnostic codes. Ignore these
created diagnostic codes and clear diagnostic codes when original diagnostic
code is corrected.
Ensure diagnostic code indicator is active and diagnostic code is active.
0009 00-252


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.