• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. Positioning Work Tool with RH (Loader) Control Lever.
AUGER OPERATION

Operators Manual For M400T And M400W
Page Navigation
  101    102    103    104    105  106  107    108    109    110    111  
img
. .
TM 5-3805-292-10
0012
REMOVAL CONTINUED
3. Remove retaining pin (Figure 8, Item 2) from housing (Figure 8, Item 1).
1
2
458-0892
Figure 8. Hydraulic Hammer Pins.
0012
4. Remove attachment (Figure 9, Item 2) from housing (Figure 9, Item 1).
1
2
458-0893
Figure 9. Removing Attachment from Hydraulic Hammer.
0012
NOTE
Install retaining pin and roll pin in housing before stowing hydraulic hammer.
5. To remove hydraulic hammer from machine, refer to WP 0010.
END OF TASK
END OF WORK PACKAGE
0012-7/(8 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.