• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 4. Implement Control - Continued.
Table 4. Implement Control - Continued.

Field Maintenance Manual 1 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  709    710    711    712    713  714  715    716    717    718    719  
img
.
TM 5-3805-291-23-1
TROUBLESHOOTING WITH A DIAGNOSTIC CODE - CONTINUED
0009 00
Table 4. Implement Control - Continued.
(MID 082)
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
427-C1656
N OT E
0354 03
This test causes implement ECM to log an open circuit diagnostic
code for this solenoid. Clear this diagnostic code from implement
ECM after troubleshooting.
1. Check solenoid.
(a) Turn engine start switch to OFF
position (TM 5-3805-291-10).
(b) Disconnect raise solenoid from
wiring harness (WP 0218 00).
(c) Turn engine start switch to ON
position (TM 5-3805-291-10).
(d) Place direction lever in NEUTRAL
position.
(e) At connector for solenoid, measure 1. If voltage is approximately 5 DCV,
replace solenoid (WP 0218 00).
voltage from implement ECM
between contact 1 (wire H713-PK) 2. If voltage is approximately battery
and contact 2 (wire H716-WH).
voltage, go to Test 2.
0009 00-205


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.